Handset w/ Curly Cord for Mitel Phone 5304 5312 5320 5324 5330 5340 5360

Regular price $18.99

Brand New, The VoIP Lounge Replacement Handset for Mitel 5300 Series IP Phones including 5304, 5312, 5320, 5320e, 5324, 5330, 5330e, 5340, 5340e, and 5360.

Also compatible with Mitel 5212 and 5224 Phones

Cord length is 12 feet fully stretched and approximately 22 inches coiled, with an extra long lead on one end. 

Cords & Lengths: As a telecom industry standard, the indicated lengths of handset cords are when they are fully stretched out, not when they are coiled in their packaging. Cords are rarely used at their full maximum stretched length, so it’s important to choose an appropriate length when buying. Available lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (42 inches coiled / unstretched)